The big buzz word in Washington, D.C., these days is budget. In the solar village at West Potomac Park, cost savings are top of mind for the decathletes as well.
This year, the Affordability Contest was added as one of the 10 contests that make up the Solar Decathlon. It replaced the Lighting Design Contest, which is now evaluated as part of other contests.
Teams can earn the 100 possible points in the Affordability Contest by achieving an estimated construction cost of $250,000 or less. A sliding point scale is applied to houses that cost between $250,000 and $600,000. Houses that receive a cost estimate of more than $600,000 receive zero points.
Matt Hansen reviews each team’s design drawings and construction specifications to estimate the total construction cost of its house. (Credit: Alexis Powers/U.S. Department of Energy Solar Decathlon)
http://www.solardecathlon.gov/blog/archives/1694
The Architect Jobs Zjob4u of your builder is not done within seclusion but it really desires near liaison using various other experts such as surveyors, technical engineers, design individuals along with providers.
ReplyDelete